Rokeby Office – 116 Rokeby St, Collingwood, Victoria

116 Rokeby St design comprised of 11 levels off office, retail and basement carparking. The project achieved the following sustainability benchmarks as part of town planning commitments. • “Excellence” BESS (Built Environment Sustainability Scorecard) rating • 5.5 Star NABERS base building office rating • WELLS v2 Core platinum rating • PCA-B Grade mechanical design

Read More

Kensington Office – 167 Kensington Rd, West Melbourne, Victoria

Paramount completed the mechanical design and construction on this four-level office building in West Melbourne. The brief on the office design was to allow for exposed ceilings and services to encompass the industrial feel of the surrounding buildings. The mechanical design included for exposed ductwork, concealed VRF airconditioning systems and 100% outside air processing units

Read More

Asics Oceana Headquarters – Marsden Park, NSW

Asics Oceana Headquarters in Marsden Park was a 5 Star NABERS base build design complete with a 4 Star rating with the Green Building Council of Australia. The mechanical design and construct project allowed for a mixed-use development of office and retail including retail showroom, main reception and void area, office and meeting rooms

Read More

Melbourne Institute of Technology – Latrobe, St Melbourne

This design and construct project consisted of the redevelopment of the 6 storey Argus building in Latrobe St to accommodate the Melbourne Institute of Technology’s city campus. The mechanical design included for roof mounted air-cooled cooling towers, condenser water flow and return pipework reticulated throughout the building to water sourced package airconditioning units on each…

Read More

Glen Eira Sports and Aquatic Centre

Complete mechanical services to the pool areas, stadium, gymnasiums, offices and retail areas. 2 x Eurogen 1250kW Non-condensing boilers 1 x Trane 540kW air-cooled Chiller Air Handling Units purpose built onsite A complete DDC/BMCS (Direct Digital Control/Building Management Control System).

Read More

Lindt Chocolates – Climate Controlled Manufacturing Facility – Marsden Park NSW

Located in Marsden Park, the facility consists of a 30,000m² temperature and humidity controlled warehouse area, 5,000m²of manufacturing and packaging facilities and 4,000m² of office areas. Three air-cooled liquid chillers are located in the external plant area and provide the Warehouse, Manufacturing and Packing areas with low temperature chilled water for air conditioning and dehumidification.…

Read More