- Main two storey office served by two rooftop air-cooled chillers, one LPG gas fired boiler and four internal air-handling plantrooms.
- Mitsubishi VRF system serving satellite offices.
- Compressed air system to the maintenance workshop.
- Pneumatic air conveying system throughout the facility.
- Full BMCS control system including monitoring the UPS, Fire, Electrical and Hydraulics systems.
Wharehouse & Distribution
Lindt & Sprungli
The Heating, Ventilation and Air Conditioning (HVAC) system at the new Lindt & Sprungli facility uses the integration of innovative and standard technologies, providing temperature and humidity conditions within specific tolerances across the Warehouse, Manufacturing and Office areas. A HVAC Building Management System (BMS) has been installed to control, monitor and analyse the HVAC system as well as interface with other disciplines such as fire, electrical and hydraulics infrastructure
Warehouse, Manufacturing and Packing
Three air-cooled liquid chillers are located in the external plant area and provide the Warehouse, Manufacturing and Packing areas with low temperature chilled water for air conditioning and dehumidification. The chilled water system uses glycol to provide chilled water flow temperatures as low as 0°C for the purposes of dehumidification. The same chillers provide a total heat reclaim option delivering heating hot water to the building’s air handling systems. This was the first time this specific model Carrier chiller has been installed in Australia.
The main warehouse is served by ten air handling units located externally and supply air at high level via fabric ductwork. The fabric ductwork was designed and developed in Italy where each individual duct run was manufactured specifically to deliver air in and around the racking spaces
Each air handling unit is provided with coiling coils suitable for the low temperature chilled water system and heating hot water coils that are connected to the chiller’s heat reclaim heating water loop. The air handling unit’s cooling coils are responsible for reducing the space temperature and are also the first stage of dehumidification. Warehouse internal design temperature is set for 14.0c and 65% humidity
The HVAC system has been designed to remove the moisture generated from incoming pallets distributed over 3-off thermal zones at a constant inflow of pallets throughout the week. A two stage dehumidification control strategy allows adjacent zone AHU’s to assist in the removal of moisture. A feature of the HVAC Building Management System (BMS) is the ability for Lindt to manually “pre-dehumidify” a Warehouse Zone prior to a large delivery of pallets.
The manufacturing and packing warehouses are served by multiple air handling and fancoil type units located on an internal plant platform. Each air handling and fancoil unit is also provided with cooling coils connected to the low temperature chilled water system and heating hot water coils connected to the chiller’s heat reclaim heating water. Each unit serves a specific room and each specific room has its own temperature and humidity specification depending on the function of each room
Offices
The office areas are airconditioned by a Variable Refrigerant Flow (VRF) multi-split air conditioning systems comprising of a centralised air-cooled condenser plant serving multiple indoor fan coil units serving all office spaces including meeting rooms and breakout spaces.
Linfox Logistics Facility
The new Linfox Logistics facility at Marsden Park consisted of a 15,000 m2 ambient warehouse complete with a dispatch office and a receiving office. The ambient warehouse is served by a manual smoke clearance system that can be used as general ventilation when required. The facility also comes with a ventilation system for the 530 m2 forklift battery charge facility, mechanical ventilation for a 5500 m2 Dangerous Goods storage room complete with hazardous goods controls and an automatic smoke management system.
The single level main office areas are airconditioned by a stand-alone ducted split conditioning systems serving all office spaces including meeting rooms, boardrooms, lunchrooms and open office spaces
DHL Supply Chain
The new DHL facility at Horsley Park consisted of a 30,000 m2 Temperature Controlled Warehouse complete with two dock offices and a manual smoke clearance system, a 2500 m2 Dangerous Goods storage room complete with mechanical ventilation, hazardous goods controls and an automatic smoke management system and a new two story administration office. A Building Management System (BMS) has been installed to control, monitor and analyse the HVAC system as well as interface with other services located around the facility.
Warehouse
The conditions in the warehouse are maintained by two Powerpax water cooled chillers located in a remote plant room. These chillers reject heat through two cooling towers located in the same plantroom. Chilled water is pumped from the HVAC plantroom to 16 airhandling units located on the main warehouse roof. These airhandling units supply conditioned air to the warehouse via a distribution of ductwork and air diffusers.
The internal design temperature for the 30,000 m2 warehouse is 22.0c deg
Offices
The two storey main office areas are airconditioned by a Variable Refrigerant Flow (VRF) multi-split air conditioning systems comprising of a centralised air-cooled condenser plant serving multiple indoor fan coil units serving all office spaces including meeting rooms, lunchrooms and breakout spaces.